Bajhang Matthilo Seti Hydropower (216 MW)

Bajhang Mathilo Seti Hydropower Project was found by Samriddhi Energy Ltd (SEPL). SEPL is the developer of Bajhang Mathilo Seti Hydropower Project (216 MW). SEPL applied for the survey licence of Bajhang Mathilo Seti Hydropower Project at DOED. SEPL was established on the year of 2072, backed up by leading persons in hydropower development with the sole purpose of generating energy in safe, cost effective, reliable, efficient and environmentally sound manner using state of the art technologies. The Company aims to generate and supply energy from various sources, mainly by hydropower. In order to pursue this goal, the Company envisage to organize and utilize the financial and technical capabilities available within the country to construct projects one after another to contribute to whatever extent possible to the energy need of nation, and assure attractive return to the investors.

  • Company Name : Samriddhi Energy Ltd.
  • Date of Registration at Company Registrar : 2072-11-12 BS (24th February, 2016)
  • PAN No : 604223056
  • Survey License : 31st July 2018 (2075 Shrawan 15)
  • Survey License No : BBB 073/74 B.U.SA. 755
  • Project : Bajhang Mathilo Seti Hydropower Project, 216 MW
  • Postal address : Naxal-01, Kathmandu Nepal
  • Postal address Telephone 01-591710601-5917107
  • Type of Organization : Public Company
Project Locations 
Development RegionSudurpaschim (Far-Western)
Local BodySaipal Rural Municipality – Ward 4 & 5 (Former Kanda VDC)
Intake SiteSaipal Rural Municipality Ward- 4 (Left) & 5 (Right), Ingaldar
Powerhouse SiteSaipal Rural Municipality Ward- 4, Ramu Khola
Geographical Co-ordinates: 
Latitude29⁰44’50” N to 29⁰50’30” N
Longitude81⁰15’00” E to 81⁰18’45” E
General 
Name of RiverSeti River
Nearest TownChainpur (Bajhang)
Gross Head750.00 m
Rated Net Head739.50 m
Net rated Head739.50 m
Installed Capacity216 MW
Net Dry Season Energy (Off-Peak)163.63GWh (13.31%)
Net Dry Season Energy (Peak)231.47 GWh (18.82%)
Net Wet Season Energy834.49 GWh (67.87%)
Net Annual Energy1,229.6 GWh (100.00%)
Hydrology 
Catchment Area909 km2
Mean Annual Discharge40.0 m3/s
Design Discharge34.10 m3/s
Downstream Compensation Flow1.41 m3/s
Design Flood Discharge at Intake805 m3/s (1000-years Return Period)
Average Annual Precipitation1,605 mm
Peaking Reservoir 
Peaking Capacity4.5 Hours
Peaking Volume0.55 Million m3
Full supply Level at Peaking StartEL 2772.42 m
Water Level at Peaking EndEL 2767.86 m
Water Level at Peaking End
Maximum Drawdown
4.56 m
Diversion Weir & Undersluice 
Diversion Weir: 
TypeRCC with Gated Spillway with emergency spillway
and Undersluice
Size48.0 m X 14.0 m
Weir Crest ElevationEL 2760.00 m
Weir Foundation LevelEL 2738.42 m
Undersluice: 
TypeFrontal, Orifice Type
Undersluice Crest LevelEL 2756.00
Undersluice Foundation LevelEL 2738.42
No. of Gates1 Nos.
Size of Gate8.0 m x 6.0 m (W x H)
Intake 
TypeSide Intake, Orifice Type
Intake Invert LevelEL 2757.85 m
Nos. of Openings4 Nos.
Size of Each Opening5.6 m x 2.0 m (W x H)
Gravel Trap 
TypeRCC, Trapezoidal
Particle Size5 mm
Length25.0 m
Section25.0 m to 5.0 m (W) x 6.25 m to 7.5 m (H)
Flushing Gallery length58 m
Approach Canal 
TypeRCC, Rectangular
Length107 m
Size5.0 m x 4.5 m (W x H)
Approach Canal 
TypeRCC, Rectangular
Length107 m
Size5.0 m x 4.5 m (W x H)
Desilting Basin 
TypeRCC, Dufour, 2-Stage Continuous Flushing
Particle Size to be Removed0.15 mm
No. of Chambers4 Nos.
Basin Size140.0 m x 11.9 m x 7.68 m (L x B x H)
Flushing Channel Size0.85 m x 0.85 m (W x H)
Flushing Channel Length252 m (Total for Intermediate & End Flushing)
Headpond 
TypeRCC, Rectangular
Size46 m x 30 m x 18 m (L x B x H)
Static water LevelEL 2,759.39 m
Tunnel Inlet invert LevelEL 2,744.17 m
Headrace Tunnel 
TypeInverted D-shaped
Size5.4 m x 5.4 m (W x H)
Length9200 m
Slope1 in 250
Construction Adits 
No. of Adits5 Nos.
TypeInverted D-shaped
Size5.4 m x 5.4 m (W x H)
Slope1 in 500
Length of Adit #1172 m
Length of Adit #2398 m
Length of Adit #3422 m
Length of Adit #4186 m
Length of Adit #5165 m
Total Length1343 m
Surge Shaft 
SectionRCC, circular, non-overflow
Diameter8.0 m
Height85.0 m
Static LevelEL 2,759.39 m
Max. Upsurge levelEL 2,786.79 m
Min. Downsurge LevelEL 2,737.09 m
Ventilation Tunnel Size5.4 m x 5.4 m (B x H)
Ventilation Tunnel Length144 m
Penstock 
Drop Shaft: 
No. of shafts2 Nos.
TypeCircular, Steel Lined
Diameter4.5 m
Height300 m (Shaft #1) & 279 m (Shaft #2)
Steel Lining3.5 m dia. MS pipe, 20 mm to 98 mm Thick
Horizontal Tunnel: 
TypeInverted ‘D’, Steel Lined
Size5.4 m x 5.4 m (W x H)
Length421 m (Shaft #1) & 796 m (Shaft #2)
Steel Lining3.5 m Dia. MS pipe, 56 mm to 112 mm Thick
Surface Penstock: 
TypeMS Pipe Encased in Concrete
Diameter Before Manifold3.5 m
Thickness Before Manifold112 mm
Length Before Manifold10 m
Diameter After Manifold1.5 m
Thickness of Pipe in Manifold112 mm
Length of Pipe in Manifold116 m
Powerhouse 
TypeSurface
Size85.0 m x 21.0 m x 23.0 m (L x B x H)
Turbine Floor levelEL 2011.0 m
Service Bay LevelEL 2014.5 m
Crane Beam Level2026.0 m
Tailrace 
TypeRCC Box, Rectangular
Size5.0 m x 2.9 m (W x H)
Length285 m
Tailrace OutletSeti River
Elevation at OutletEL 2004.81 m
Turbine 
TypePelton, Vertical Axis
Number of units.5 Nos.
Rated Discharge45 MW (Each Unit)
Rated Discharge6.80 m3/s (Each Unit)
Rated Speed600 RPM
Efficiency91.0%
Turbine Axis ElevationEL 2010.0 m
Generator 
TypeSalient Pole, Synchronous
Rated Capacity50.85 MVA (Each Unit)
Rated Voltage11 kV
Power Factor0.85
Frequency50 Hz
No of Units5
Excitation SystemBrushless
Efficiency96%
Transformer 
TypeOutdoor, 1-Phase
Rated Capacity18.5 MVA (Each Unit)
Voltage Ratio132/11 KV
No of Units /td>15 Nos. + 1 (Spare)
Frequency50Hz
CoolingONAN
Efficiency99.00 %
Transmission Line 
Voltage Level132 kV, Double-Circuit (Cardinal)
Length126 km
Connection PointNEA’s Lamki Sub-Station Kailali
Project Cost Estimate 
Total Project Cost (Excluding IDC)NRs. 41,646 Million
Total Project Cost (Including IDC)NRs. 47,900 Million
Specific Project Cost (Financial)NRs. 22.18 crores (US$ 1,928) Per kW
Construction Period4 Years
Financial Indicators 
Reference year (Exchange Rate)August 2019 (1 US$ = NRs. 115)
Interest Rate12%
B/C Ratio1.06
NPVNRs. 1,840 million
FIRR12.68%
Return on Equity (ROE)16.02%
Simple Payback Period6.47 years
Discounted Payback Period12.33 years

Project Accessibility

The project site is accessible from Chainpur is 898 km from Kathmandu passing through Narayanghat, Butwal, Attariya, Dadeldhura and Khodpe. Out of this, Kathmandu to Attariya section (647 km) lies in the East-West Highway; Attariya to Khodpe section (141 km) lies in Mahakali Highway; whereas Khodpe to Chainpur section (110 km) is black-topped feeder road. From Chainpur, Rupatola is accessible by a 20 km long fair-weather road towards north-east. About 25 kilometer of road is required to be constructed by the Project for access to different sites

Accessibility of Project Site
  1. Kathmandu to Attariya– 647 km black topped
  2. Attariya to Khodpe – 141 km black topped
  3. Khodpe to Chainpur – 110 km black topped
  4. Chainpur to Rupatola- 20 Km fair-weather road
  5. Rupatola- PH- to be constructions by project

Project Layout

*Click on the pins to get the location details